London Borough of Hackney
Article 4 direction area: Addition to Hackney Central Major Town Centre (part 2) A4D-2018-FLEXIBLE-TOWN-CENTRE-USES-A30
Legend
- London Borough of Hackney boundary
- Article 4 direction areas
Addition to Hackney Central Major Town Centre (part 2) A4D-2018-FLEXIBLE-TOWN-CENTRE-USES-A30
- start-date
- 2019-02-11
- entry-date
- 2026-09-10
- name
- Addition to Hackney Central Major Town Centre (part 2)
- description
- reference
- A4D-2018-FLEXIBLE-TOWN-CENTRE-USES-A30
- geometry
-
MULTIPOLYGON (((-0.054709 51.550090,-0.054816 51.550081,-0.055133... - notes
- Geometry from Hackney GeoServer WFS layer planning:a4d_flexible_town_centres_uses (map2.hackney.gov.uk, downloaded 2026-09-10). WFS feature prinx 30.
- article-4-direction
- A4D-2018-FLEXIBLE-TOWN-CENTRE-USES
- end-date
- permitted-development-rights
- 4D
- address-texts
- uprns
- point
-
POINT (-0.054920 51.549840) - organisation
- uprn
- ADDRESS1, ADDRESS2, ADDRESS3, POSTCODE