Skip to main content
London Borough of Hackney

Article 4 direction area: Priority Industrial Area - Prout Road A4D-2022-DESIGNATED-INDUSTRIAL-AREAS-A12

Legend

  • London Borough of Hackney boundary
  • Article 4 direction areas

Priority Industrial Area - Prout Road A4D-2022-DESIGNATED-INDUSTRIAL-AREAS-A12

start-date
2023-10-05
entry-date
2026-09-10
name
Priority Industrial Area - Prout Road
description
reference
A4D-2022-DESIGNATED-INDUSTRIAL-AREAS-A12
geometry
MULTIPOLYGON (((-0.056522 51.560080,-0.056363 51.559641,-0.055819...
notes
Geometry from Hackney GeoServer WFS layer planning:a4d_designated_industrial_area (map2.hackney.gov.uk, downloaded 2026-09-10). WFS feature prinx 12.
article-4-direction
A4D-2022-DESIGNATED-INDUSTRIAL-AREAS
end-date
permitted-development-rights
3MA
address-texts
uprns
point
POINT (-0.055737 51.559829)
documentation-url
organisation
uprn
ADDRESS1, ADDRESS2, ADDRESS3, POSTCODE